  Electrical Upgrades
 
Madison Electric - Borough Utility Engineer

Madison Electric - Borough Utility Engineer
The Borough of Madison, New Jersey, owns and maintains its' own electric utility system, purchasing 34.4KV power from the Jersey Central Power & Light Company, now GPU Energy. The installed capacity of the Borough's system is approximately 88MVA and consists of a 34.4KV sub-transmission system, and 4.16KV and 12.4KV distribution systems.

Crane Associates, P.C. has been retained as the Engineer of Record for the Borough of Madison's Electrical Department for the past 35 years.


Montclair State University - Electric Upgrade

Montclair State University - Electric Upgrade
The University’s campus-wide electrical system, originally consisting of an outdated 13.2KV - 4.16KV, 7 MVA substation was upgraded with new 26.4KV PSE&G utility feeders; two (2) 20 MVA, 26.4KV - 4.16KV, 2400 VAC transformers and two (2) lineups of 4.16 KV switchgear housed in a new switchgear building.

Included in the upgrade was the replacement of nine (9) radial feeders which serve approximately forty (40) buildings on campus.

  Questions or Comments

If you have any questions or comments please take a moment to fill-out the form below. -Thank you

Enter Email Address  email address:
Enter Questions or Comments
  

Copyright © 2017 Crane Associates, P.C. All Right Reserved.